Digital Facility Management

Mechanical checklist

Seasonal changeover: heating ⇄ cooling

The big twice-a-year switch: isolate, drain/fill, verify pumps and setpoints, and record the system you leave running.

11 steps · 2 photos asked for · 1 readings recorded

Every step, in order

This is what a technician is asked, one question at a time, on the phone.

  1. 1

    Scan the plant/mechanical room tag

    Scan the tag · needed

  2. 2

    Changeover direction

    Pick one · needed

  3. 3

    Off-season system isolated (valves tagged and closed)?

    Yes or no · needed

  4. 4

    Seasonal pumps rotated/exercised and running without noise or leaks?

    Yes or no · needed

  5. 5

    Loop pressure after changeover

    Reading in psi · needed

  6. 6

    Photograph the pump issue

    Photo · needed

  7. 7

    BAS/thermostat setpoints updated for the season?

    Yes or no · needed

  8. 8

    Pump issue found during seasonal changeover.

    Tell somebody · needed

  9. 9

    Strainers blown down / cleaned?

    Yes or no · needed

  10. 10

    Photo of the plant as left running

    Photo · needed

  11. 11

    Notes

    Written answer · needed

What this looks like on a phone

The checklist above is a workflow, not a document. Which changes four things.

  • One question at a time, so nothing is skipped
  • The tag is scanned, so the record cannot be filed against the wrong unit
  • A failed check raises tracked work with the photo already attached
  • The report exists the moment the last question is answered