Mechanical checklist

Rooftop unit: quarterly PM

Filters, belts, coils, electrical, and operating temperatures for packaged rooftop units. This is the PM record that defends the warranty and the budget.

13 steps · 3 photos asked for · 2 readings recorded

Every step, in order

This is what a technician is asked, one question at a time, on the phone.

  1. 1

    Scan the RTU tag

    Scan the tag · needed

  2. 2

    Filters

    Pick one · needed

  3. 3

    Belts: tension and condition acceptable (no cracks, glazing, fraying)?

    Yes or no · needed

  4. 4

    Condenser + evaporator coils

    Pick one · needed

  5. 5

    Photograph the belt condition

    Photo · needed

  6. 6

    Supply air temperature (cooling call)

    Reading in °F · needed

  7. 7

    Return air temperature

    Reading in °F · needed

  8. 8

    Electrical: contactors, wiring, and disconnect in good condition?

    Yes or no · needed

  9. 9

    Condensate drain clear and trap primed?

    Yes or no · needed

  10. 10

    Photograph the electrical issue

    Photo · needed

  11. 11

    Overall unit photo

    Wide shot of the unit as you leave it.

    Photo · needed

  12. 12

    RTU electrical issue found during quarterly PM. See photo.

    Tell somebody · needed

  13. 13

    Notes

    Written answer · needed

What this looks like on a phone

The checklist above is a workflow, not a document. Which changes four things.

  • One question at a time, so nothing is skipped
  • The tag is scanned, so the record cannot be filed against the wrong unit
  • A failed check raises tracked work with the photo already attached
  • The report exists the moment the last question is answered